AIA MIAMI
Join our Newsletter

A SERIES : Owner- Contractor Documents

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2007)
$12.00
A102 Standard form of agreement between Owner and Contractor where the basis of payment is the cost plus a fee
with a negotiated guaranteed maximum price. With instruction s (2007) = A111
$12.00
A103 Standard form of agreement between Owner and Contractor cost of work plus a fee without GMP (2007) = A114
$12.00
A105 Standard form of agreement between Owner and Contractor for a residential or small commercial project (2007)
$10.00
A107 Standard form of agreement between Owner and Contractor for a project of limited scope (2007)
$12.00
A132 Standard form of agreement between Owner and Contractor, Construction Manager as Advisor Edition (2009) = A101CMa
$12.00
A133 Standard form of agreement between Owner and Construction Manager as Constructor where the basis of payment is
the cost of the work plus a fee with a guaranteed maximum price (2009) = A121CMc
$12.00
A134 Standard form of agreement between Owner and Construction Manager as constructor where the basis of payment is the cost of the work plus a fee without a guarantee maximum price (2009) = A131CMc
$12.00
A141 Standard form of agreement between Owner and Design/Builder with instructions (2004) Old list as A191
$12.00
A142 Standard form of agreement between Design/Builder and Contractor (2004) Old list as A491
$12.00
A151 Standard form of agreement between Owner and Vendor for furniture, furnishings & equipment where the basis of payment is a stipulated sum (2007) = A175ID
$12.00
A195 Standard Form of Agreement between Owner and Contractor for Integrated Project Delivery – 2008
$12.00
A201 General Conditions of the contract for construction with instructions (2007)
$12.00
A232 General Conditions of the Contract for Construction, Construction Manager as Advisor Edition (2009) = A201CMa
$12.00
A251 General Conditions of the contract for furniture, furnishing and equipment with instructions (2007) = A275/ID
$12.00
A295 General Conditions of the contract for integrated project delivery – (2008)
$14.00
A305 Contractor’s Qualification Statement with instructions (1986)
$ 6.00
A310 Bid Bond (1970)
$ 6.00
A310 Bid bond (2010)
$ 6.00
A312 Performance Bond and Payment Bond with instructions (2010)
$ 6.00
A312 Performance Bond and Payment Bond with instructions (1984)
$ 6.00
A401 Standard form of agreement between contractor and subcontractor with instruction (2007) =A401
$12.00
A441 Standard form of agreement between contractor and subcontractor for a design-build project (2008)
$10.00
A701 Instructions to Bidders (1997)
$10.00
A751 Invitation and instructions for Quotation for Furniture, Furnishings and Equipments (2007) =A775/ID
$10.00